Skip to content
ChargePatrol – ChargePatrol Mobile EV Charging
Mobile EV charging for construction job sites fleets

Fleet charging · Construction Job Sites

EV Charging for Construction Job Sites

Construction sites rarely have permanent power, and a temporary service drop just for vehicle charging is slow and costly.

How we help

Mobile charging built for construction job sites

ChargePatrol brings DC energy to the site so electric pickups and work trucks stay charged, and the service moves with the project.

Visits usually happen at the start or end of the workday, when crew vehicles are parked on site.

Vehicles we charge

  • Electric pickups
  • Electric work and service trucks
  • Crew vans

Program at a glance

Charging type
Level 3 DC fast charging from onboard storage
Go-live
Live in 7 days once scope and access are agreed
Pricing
Custom per-kWh or per-visit quote
Contract
No long-term contract required to start
On-road rescue
24/7/365 dispatch for your drivers
Reporting
Each session logged by vehicle

Fleet inquiry

Get a construction job sites charging quote

Vehicle types

By submitting you agree to our privacy policy.

The challenge

Why charging is hard for construction job sites

  • No site power

    Temporary electrical service takes time to arrange.

  • Remote sites

    Projects can be far from public chargers.

  • Changing locations

    The job site moves when the project does.

Our programs

What ChargePatrol provides

  • On-site charging

    Scheduled visits to your active job sites.

  • No service drop

    Energy arrives on the unit.

  • Moves with you

    Visits follow your project schedule from site to site.

Hardware

Mobile DC units on your site

Battery-based units deliver DC fast charging without a grid connection.

onboard energy storage
Up to 200 kWh
continuous DC output
60–65 kW
per vehicle on multi-gun units
Up to 180 kW
rated, −30 °C to 50 °C operation
IP54

Connector compatibility is confirmed for your vehicles before service.

Process

From first call to charging in five steps

  1. 1Discovery callTell us your vehicles, sites, shifts and how much energy each vehicle uses in a day.
  2. 2Site and schedule reviewWe review parking layout, access and dwell times at each site.
  3. 3Charging plan and quoteYou receive a visit schedule, rescue coverage and a custom per-kWh or per-visit quote.
  4. 4Live in 7 daysScheduled visits start; 24/7 dispatch covers vehicles on the road.
  5. 5Operate and reportEach session is logged by vehicle so you can reconcile energy against routes and budgets.

For an accurate quote, share

  • Number and types of vehicles (make, model, battery size if known)
  • Site addresses where vehicles park, and parking layout
  • Shift times and how long vehicles sit between runs
  • Typical daily miles or energy per vehicle
  • Any fixed chargers already on site
  • When you want service to start
Request a quote

Straight answers

Construction Job Sites charging FAQ

If your situation is urgent, call dispatch now.

281-473-1221

Do you need power on the site?

No. Our units carry stored energy.

Can you serve several sites in one day?

Yes. We plan visit routes across your active sites.

How is fleet charging priced?

Custom quotes based on your vehicles, sites and energy needs, usually per kWh or per visit. No long-term contract is required to start.

How quickly can service start?

Service can be live in 7 days once scope and site access are agreed.

Is it Level 2 or DC fast charging?

ChargePatrol units deliver Level 3 DC fast charging from onboard energy storage, so no grid connection is needed at your site.

Here when you need us

Charge your construction job sites fleet without waiting on construction

Tell us about your vehicles and sites. We will scope a mobile charging plan and a custom quote.

Call nowBook online